<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" version="2.0">
  <channel>
    <title><![CDATA[News & Media]]></title>
    <link>http://reliablehire.com.au/news/</link>
    <description><![CDATA[News & Media]]></description>
    <pubDate>Thu, 27 Feb 2020 01:04:11 +0000</pubDate>
    <generator>Zend_Feed</generator>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <item>
      <title><![CDATA[Hydrophilic Waterstops for Cast In-Situ Concrete]]></title>
      <link>http://reliablehire.com.au/news/hydrophilic-waterstops-for-cast-in-situ-concrete/</link>
      <description><![CDATA[<p>Where waterproofing is concerned, construction joints are one of the weakest points of the structure. These areas are highly susceptible to water infiltration, which can lead to the deterioration of the concrete and its surrounding reinforcement. As a result, concrete joints require a considerable amount of protection.</p>
<p><strong>Hydrophilic Waterstops and How They Work</strong></p>
<p>Hydrophilic waterstops are a cost-effective solution for protecting the watertight integrity of cast in-situ concrete. They prevent moisture from seeping into weak concrete joints, specifically zero- to low-movement concrete like the cold-joint between a footing and foundation. Hydrophilic waterstops can also be applied to formwork spacers, tie rods and pipe penetrations.</p>
<p>The &lsquo;hydrophilic&rsquo; name comes from how these types of waterstops work. When they absorb water, hydrophilic waterstops expand dramatically, enough to create a protective, impermeable and long-lasting compression seal.</p>
<p><strong>Advantages of Hydrophilic Waterstops</strong></p>
<p>Hydrophilic waterstops consist of various materials that exhibit excellent and long-lasting durability and water-sealing abilities. When properly applied, hydrophilic waterstops can seal heads of water up to 50 metres, specifically in sealing horizontal and vertical joints for both new and existing concrete.</p>
<p>The self-adhesive properties of hydrophilic waterstops reduce the need for a concrete adhesive, which in turn can cut down construction costs. Some hydrophilic waterstops even have a specific formula that reduces the risks of concrete spalling and premature expansion.</p>
<p><strong>High-Quality Hydrophilic Waterstops from Form Direct</strong></p>
<p>Form Direct carries a range of high-quality&nbsp;<a href="http://formdirect.com.au/products/formwork-reinforcing/waterstops.html">hydrophilic waterstops for concrete joints</a>. Create crack-free watertight joints with premium-grade products that expand without the risk of damaging the structure. Use our versatile hydrophilic waterstops for a wide variety of applications including tunnels, subway stations, water reservoirs and other non-moving concrete joints.</p>
<p>Among our range of hydrophilic waterstops is Hydrotite which can expand up to eight times. The composition of Hydrotite consists of a combination of a swelling hydrophilic material and a non-expanding chloroprene rubber. Once exposed to water or moisture, the hydrophilic part will turn blue while the non-expanding component will turn black. This allows builders and contractors to check if Hydrotite has pre-expanded before its application.</p>
<p><strong>Premium Concrete Solutions and Reliable Customer Service</strong></p>
<p>As one of Australia's trusted suppliers, Form Direct provides only premium waterstops that effectively block off moisture from all types of concrete. We are specialists in products and solutions for the concrete building industry. We liaise closely with every client to provide solutions based on their specific needs.</p>
<p>We have our own in-house delivery team and fleet, giving us full control and assuring you that nothing is overlooked. We see delivery not as the 'last step' but as a crucial step in the success of your project. From clear and accurate paperwork to responsive follow-throughs, we take care of everything so you can focus on other important things that matter to you.</p>
<p>And we do not just stop there. We make sure that you have everything you need. Our 24-hour support network is always on standby to give you reliable customer service whenever you need it.</p>
<p>For quotes and professional advice, get in touch with us today.</p>
<p>&nbsp;</p>]]></description>
      <pubDate>Fri, 28 Sep 2018 06:36:29 +0000</pubDate>
    </item>
    <item>
      <title><![CDATA[Formwork Open Day 2016]]></title>
      <link>http://reliablehire.com.au/news/formwork-open-day-2016/</link>
      <description><![CDATA[<p><img alt="" src="http://reliablehire.com.au/media/wysiwyg/wysiwyg/full-spec.jpg" width="100%" /></p>]]></description>
      <pubDate>Mon, 05 Sep 2016 06:43:38 +0000</pubDate>
    </item>
    <item>
      <title><![CDATA[Kin Kuna Sand Mine]]></title>
      <link>http://reliablehire.com.au/news/kin-kuna-sand-mine1/</link>
      <description><![CDATA[<p><img src="http://reliablehire.com.au/media/wysiwyg/NEWSLETTER-2015/kk-sandmine1-lrg1.jpg" alt="" /></p>
<p>Our partnership with Murchie Constructions saw the completion of the Kin Kuna Sand Mine a success!</p>
<p>With Steel Reinforcing and Formwork, the project went seamlessly through to completion &ndash; thanks to our in-house schedulers and production team. All hire machinery was there on time, every time, no fuss!</p>
<p><img src="http://reliablehire.com.au/media/wysiwyg/NEWSLETTER-2015/kk-sandmine1-lrg2.jpg" alt="" /></p>]]></description>
      <pubDate>Fri, 17 Jul 2015 06:48:16 +0000</pubDate>
    </item>
    <item>
      <title><![CDATA[Harvey Norman Warehouse - Bundaberg]]></title>
      <link>http://reliablehire.com.au/news/harvey-norman-project/</link>
      <description><![CDATA[<p><img style="float: left; margin: 5px;" src="http://reliablehire.com.au/media/wysiwyg/NEWSLETTER-2015/hnw-project1-big.jpg" alt="" />The Harvey Norman warehouse in Bundaberg was constructed by Mainbrace Constructions. Form Direct partnered with Mainbrace, suppling all the reinforcing for the Tilt Panels and slab on ground.</p>
<p><a title="Bundaberg Location - GMaps" href="https://www.google.com/maps/place/Form+Direct/@-24.889103,152.33075,15z/data=!4m2!3m1!1s0x0:0x3911fcc9a3c71044" target="_blank"><img src="http://reliablehire.com.au/media/wysiwyg/NEWSLETTER-2015/bundy-locator1.jpg" alt="" /></a></p>]]></description>
      <pubDate>Mon, 13 Jul 2015 01:13:30 +0000</pubDate>
    </item>
    <item>
      <title><![CDATA[Steel-Ply Formwork - House Retaining Wall]]></title>
      <link>http://reliablehire.com.au/news/steel-ply-house-retaining-wall-april-20151/</link>
      <description><![CDATA[<p><img title="Steel-Ply-Formwork-April-2015" src="http://reliablehire.com.au/media/wysiwyg/steel-ply-blog-april-2015-Image-01.jpg" alt="Steel-Ply-Formwork-April-2015" width="640" /></p>
<p>Another successful Steel-Ply Project. This project was a 50m retaining wall split into 2 parts. Without Steel-Ply, the whole project would have taken a lot longer, but the Steel-Ply system is so fast and easy to use.</p>
<p>&nbsp;</p>
<p><img title="Steel-Ply-Formwork-April-2015" src="http://reliablehire.com.au/media/wysiwyg/steel-ply-blog-april-2015-Image-03.jpg" alt="Steel-Ply-Formwork-April-2015" width="640" /></p>
<p>Looking from the 'back' side.</p>
<p>&nbsp;</p>
<p><img title="Steel-Ply-April-2015" src="http://reliablehire.com.au/media/wysiwyg/steel-ply-blog-april-2015-Image-02.jpg" alt="Steel-Ply-April-2015" /></p>
<p>Looking into the formwork - Reinforcing Steel set-up.</p>
<p>&nbsp;</p>
<p><img title="Steel-Ply-April-2015" src="http://reliablehire.com.au/media/wysiwyg/steel-ply-blog-april-2015-Image-04.jpg" alt="Steel-Ply-April-2015" /></p>
<p>Concrete being poured into the wall.</p>
<p>&nbsp;</p>
<p><img title="Steel-Ply-April-2015" src="http://reliablehire.com.au/media/wysiwyg/steel-ply-blog-april-2015-Image-05_1.jpg" alt="Steel-Ply-April-2015" /></p>
<p>Dismantling the Steel-Ply - half the wall done.</p>
<p>&nbsp;&nbsp;</p>
<p>For more information about Steel-Ply - <a title="CLICK HERE" href="http://formdirect.com.au/products/formwork-reinforcing/steel-ply-modular-formwork.html" target="_self">CLICK HERE</a></p>]]></description>
      <pubDate>Wed, 22 Apr 2015 06:18:38 +0000</pubDate>
    </item>
    <item>
      <title><![CDATA[Wayne Kleidon - Testimonial]]></title>
      <link>http://reliablehire.com.au/news/wk-test1/</link>
      <description><![CDATA[<p><img title="Wayne Kleidon Constructions - Testimonial" src="http://reliablehire.com.au/media/wysiwyg/blog/wk-con2.jpg" alt="Wayne Kleidon Constructions - Testimonial" /></p>
<p><a onclick="return false;" href="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc1.jpg" rel="prettyPhoto[prettyPhoto]"><img style="margin: 5px;" title="Wayne Kleidon Construction Management" src="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc1.jpg" alt="Wayne Kleidon Construction Management" width="250" /></a> <a onclick="return false;" href="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc2.jpg" rel="prettyPhoto[prettyPhoto]"><img style="margin: 5px;" src="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc2.jpg" alt="Wayne Kleidon Construction Management" width="250" /></a> <a onclick="return false;" href="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc3.jpg" rel="prettyPhoto[prettyPhoto]"><img style="margin: 5px;" src="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc3.jpg" alt="Wayne Kleidon Construction Management" width="250" /></a> <a onclick="return false;" href="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc4.jpg" rel="prettyPhoto[prettyPhoto]"><img style="margin: 5px;" src="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc4.jpg" alt="Wayne Kleidon Construction Management" width="250" /></a> <a onclick="return false;" href="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc5.jpg" rel="prettyPhoto[prettyPhoto]"><img style="margin: 5px;" src="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc5.jpg" alt="Wayne Kleidon Construction Management" width="250" /></a> <a onclick="return false;" href="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc6.jpg" rel="prettyPhoto[prettyPhoto]"><img style="margin: 5px;" src="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc6.jpg" alt="Wayne Kleidon Construction Management" width="250" /></a> <a onclick="return false;" href="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc7.jpg" rel="prettyPhoto[prettyPhoto]"><img style="margin: 5px;" src="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc7.jpg" alt="Wayne Kleidon Construction Management" width="250" /></a> <a onclick="return false;" href="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc8.jpg" rel="prettyPhoto[prettyPhoto]"><img style="margin: 5px; display: none;" src="http://reliablehire.com.au/media/wysiwyg/blog/WK/iwc8.jpg" alt="Wayne Kleidon Construction Management" width="250" /></a></p>]]></description>
      <pubDate>Fri, 31 Oct 2014 02:13:29 +0000</pubDate>
    </item>
    <item>
      <title><![CDATA[IWC Bundaberg Building Project]]></title>
      <link>http://reliablehire.com.au/news/iwc-bundaberg-project/</link>
      <description><![CDATA[<p class="annotated-body"><strong>Form Direct</strong> recently worked with&nbsp;<span>Wayne Kleidon Construction Management</span>&nbsp;who was the site manager for the Bundaberg IWC (Indigenous Well-being Centre). Form Direct supplied IWC with their concrete reinforcing, curing agents and other general construction supplies. The project was completed in September 2014. IWC -&nbsp;<a href="http://www.iwc.org.au/news/iwc-celebrates-new-building" target="_blank">http://www.iwc.org.au/less</a></p>
<p></p>]]></description>
      <pubDate>Wed, 19 Feb 2014 22:47:28 +0000</pubDate>
    </item>
  </channel>
</rss>
